Skip to content

Glass Meeting Room The POD, Barry

Overview

We designed and installed a new glass meeting room at The POD in Barry, an employment community hub supported by the Vale of Glamorgan Council that helps people back into work.

The hub needed a private space for meetings and classes within its open-plan area, without losing the natural light that keeps the space bright and welcoming. The POD chose to work with us as a local company that specialises in glass partitions.

Scope of Work

Frameless glass meeting room

We built a 5m x 4m meeting room in the corner of the open-plan area using a 10mm frameless glass system with white trims. Glazing the full height of the room allows as much natural light as possible to flow through the space.

Privacy manifestation

A frosted manifestation band was applied at mid level. It gives people inside the room privacy during meetings and classes while keeping both the room and the surrounding area bright.

Accessible door

The room has a wheelchair-accessible glass door with stainless steel door furniture, so everyone who uses the hub can get in and out easily.

Inside the new glass meeting room at The POD, Barry, with frosted privacy band and white trims
Glass meeting room in the corner of the open-plan area at The POD community hub in Barry

Challenges and Solutions

The main challenge was the curved bulkheads in the ceiling where the new room needed to sit. A standard straight run of glass would not meet them cleanly, so we used additional glass nibs to follow the shape of the ceiling and make the design work.

The hub also needed to stay open throughout. We completed the installation in a day and a half, with half a day to frame up and one day for the glass fit and manifestation, and everything kept running during normal hours while we worked.

Results

The POD now has a bright, private meeting room that sits naturally in the corner of its open-plan space. The team at The POD is really pleased with the new room and has already seen the benefits of having a dedicated space for meetings and classes.

The project shows how a frameless glass partition can create a private room quickly and with minimal disruption, while keeping an open space light and welcoming. From order to survey to fitting, glass partition projects like this generally take around 7 to 10 working days.

Glass meeting room beside the windows at The POD, Barry, letting natural light into the open-plan space

Project Details

  • Location: Barry, Vale of Glamorgan
  • Project type: Glass meeting room
  • Client: The POD, an employment community hub supported by the Vale of Glamorgan Council
  • Works: 10mm frameless glass partition system with white trims, wheelchair-accessible glass door, stainless steel door furniture and frosted privacy manifestation
  • Time on site: One and a half days

Need a glass meeting room or office partition in South Wales? Get in touch to talk through your project.

South Wales
info@interiorsystemswales.co.uk
01446 750994